Fire Damage Repairs, PAE Government Services Project
​
Description of Project:
TW was involved in replacing and repairing the brick wall, gate, pavements, guard-box, lighting, cameras and associated electricity services at the Baghdad Embassy Compound.
We relocated the water supply and constructed a concrete reinforced wall in two sections divided by an entrance driveway with a steel vehicle entrance gate and a smaller pedestrian gate with pavements. We fabricated a metal entrance gate, metal pedestrian gate and “Y” shaped barbed wire brackets for the top of the wall. The existing guard-box was refurbished with opening windows, interior and exterior paint and a new A/C unit. Barbed wire was then fitted to the entire wall and gates utilising the fabricated “Y” brackets.
​
Contract Date: June 2018 – July 2018
Contract Value: $75,264.00
Location: BEC, Baghdad, IRAQ
Reference Name: Ganesan Rajamani
Ref Contact: Ganesan.Rajamani@pae.com
​



Project:
2020 Dodge RAM double cab and Kia Sorento lease.
​
Duration: Twelve Month Lease 2020/21
Location: Baghdad, Iraq
Scope of Works:
-
Twelve month lease arranged for Vectrus.
-
The contract includes monthly maintenance and all insurance.

Project:
2019 Toyota Hi-Lux double cab pick up lease.
​
Duration: Twelve Month Lease 2019/20
Location: Baghdad, Iraq
Scope of Works:
-
Twelve month lease arranged for the US Military.
-
The contract included monthly maintenance and all insurance.